Süwag Energie AG

Frankfurt/Höchst


Along the river Main in Höchst the new administrative center of Süwag Energie AG was constructed. The organic building shape intermediate between the heterogeneous metropolitan structures in the surroundings. The well-balanced proportions optimize the building energetically and create attractive views towards the old town of Höchst, to the Main and to the Taunus. The landscape zone of Main and Brüningpark is merged by a new pathway-relation creating an attractive forecourt going on from the foyer through to the courtyard.

Timeframe:
2007–2010
Area:
27.300 m²
Volume:
106.900 m³
Client:
Süwag Energie AG
Typology:
Office building

More projects