Assembly Hall Saxonia

Alzenau

Project management for the construction of a new assembly hall with a two-storey office wing in Alzenau, Bavaria, for the precious metal processing company Saxonia Technical Materials. The hall is used for the production and manufacture of fusion metallurgical materials and for the production of fluxes and solder pastes. The associated technology and high safety requirements, such as fire protection measures, have been taken into account in the overall concept. The strict environmental and nature conservation requirements also had a significant influence on the planning of the building and were, of course, comprehensively integrated.

Timeframe:
2021–2023
Area:
10.600 m²
Typology:
Commercial
Phases (HOAI):
6-8

More projects